The scope comprised the construction of crushing, screening, HPGR and deagglomerator buildings and all associated materials handling systems at Talison Lithium’s Greenbushes mine site.
The HPGR building included conveyors, transfer station and primary screen feed sizer, screen oversize conveyor and surge bin, surge bin belt feeder as well as all associated chutes.
Also included were the installation of the reclaiming equipment in the secondary ore stockpile reclaim vault, the stockpile reclaim belt feeder and the High Pressure Grinding Rollers (HPGR), the fresh ore conveyor plus all associated mechanical and electrical equipment.
Bulk Storage and
Materials Handling
STRUCTURAL,
MECHANICAL, PIPING
NON-PROCESS
INFRASTRUCTURE
Kerman provides fully integrated design and construction expertise. Our capability is defined by several key areas, with delivery by traditional means, construct only, design and construct and engineering, procurement & construction (EPC) or Managing Contractor.