Successful project delivery
No Matter Where
Home / Projects / Transport/Port Infrastructure / Bulk Storage and Materials Handling / Geraldton Port Iron Ore Storage & Handling Facility

Geraldton Port Iron Ore Storage & Handling Facility

Location: Geraldton Port, WA
Client: Murchison Metals
Project Value: $12.8M

A turnkey design and construction project consisting of a 100,000 tonne iron ore storage building, truck road receival facility integrated into the Port’s existing infrastructure and fully enclosed inloading and outloading conveyors.

The facility is designed to meet stringent environmental standards at the Port location, including a fully encapsulated building shell with a negative pressure dust system to eliminate product escape.

Transport/Port Infrastructure

Bulk Storage and
Materials Handling

NON-PROCESS
INFRASTRUCTURE

Contact Us

Kerman provides fully integrated design and construction expertise. Our capability is defined by several key areas, with delivery by traditional means, construct only, design and construct and engineering, procurement & construction (EPC) or Managing Contractor.