Between 1993 and 2007 Kerman worked on various projects upgrading the Esperance Port Facilities.
Sulphur Storage and Handling Facility
Design and construction of the Port’s sulphur import facility which served the BHP Billiton Ravensthorpe Nickel operations. Work included a 120,000 tonne storage building for sulphur prill, product inloading conveyor from the Port’s ship unloader and a sophisticated truck loading system with associated hopper and conveyors.
Iron Ore Storage Facilities – Shed 1 to 4
Design and construction of four iron ore stockpile buildings, complete with conveyor inloading and outloading systems connected to the Port’s existing infrastructure.
Concentrate Storage Facility
Construction of a new nickel concentrate storage facility including conveyor.
Bulk Storage and
Materials Handling
NON-PROCESS
INFRASTRUCTURE
Kerman provides fully integrated design and construction expertise. Our capability is defined by several key areas, with delivery by traditional means, construct only, design and construct and engineering, procurement & construction (EPC) or Managing Contractor.