The scope of work included the design and construction of a Bulk and Liquid Fertilizer Import, Storage & Dispensing facility at CBH’s Export Terminal in Kwinana. In more detail the scope comprised:

  • Dry Fertilizer Warehouse (55,000t).
  • Two Liquid Fertilizer Tanks 16,000t each.
  • Two UAN Truck Loading Stations 2x100t/hr capacity.
  • 1.8 km long pipeline including pig launcher and receiver.
  • Two weighbridges.
  • Wheel wash station.
  • Sitewide automation and control system.
  • Admin building.
  • Contaminated water evaporation pond.
  • Site clearing, bulk earthworks, site roads.
  • All concrete works including piling for tanks, SMPE works.

Agriculture

Bulk Storage and
Materials Handling

STRUCTURAL,
MECHANICAL, PIPING

NON-PROCESS
INFRASTRUCTURE

Contact Us

Kerman provides fully integrated design and construction expertise. Our capability is defined by several key areas, with delivery by traditional means, construct only, design and construct and engineering, procurement & construction (EPC) or Managing Contractor.