The scope of work incorporated the construction of a 55,000 tonne bulk storage facility consisting of an inload and outload material handling circuit. The design of the inload and outload system was capable of delivering 500tph and 2000tph respectively.
The facility will be used to store Spodumene concentrate from Talison Lithium’s Greenbushes mine site, which will be then loaded onto bulk ships via the existing Port’s ship loader.
Bulk Storage and
Materials Handling
STRUCTURAL,
MECHANICAL, PIPING
NON-PROCESS
INFRASTRUCTURE
Kerman provides fully integrated design and construction expertise. Our capability is defined by several key areas, with delivery by traditional means, construct only, design and construct and engineering, procurement & construction (EPC) or Managing Contractor.