Design and construction of a process facility for the manufacture of concrete paving
blocks. This project included detail design, fabrication and erection of the main process building, materials in-load building and associated switchrooms and transformer compounds.
These buildings incorporated concrete pits and a large insulated curing chamber.
Kerman also provided labour, supervision and equipment to install mechanical items in the inload, raw products and mixer plant areas.
Bulk Storage and
Materials Handling
STRUCTURAL,
MECHANICAL, PIPING
NON-PROCESS
INFRASTRUCTURE
Kerman provides fully integrated design and construction expertise. Our capability is defined by several key areas, with delivery by traditional means, construct only, design and construct and engineering, procurement & construction (EPC) or Managing Contractor.