Location: Albany Port, WA Client: Plantation Woodchip Terminals Project Value: $3.8M

A supply and construct project for the export of woodchips through the Albany Port. The facility is designed to receive woodchips via a truck unloading station which is then transferred by a conveyor system onto a rotating stockpile stacker.
Woodchips are reclaimed by front end loader onto a conveying system which has been integrated into the existing export conveyor. Kerman was responsible for the structural and mechanical supply and erection for this facility.
