Yarnima Power Station Non-Generating Infrastructure Pack 2

Location: Newman, WA    Client: BHPB Iron Ore    Project Value: $14M

Yarnima Power Station Non-Process Infrastructure

Design and Construct of a workshop/store, a control room/administration building and two 800m3 diesel storage tanks and system at BHPBIO’s Yarnima Power Station.

The workshop/store has a mezzanine floor on one half of the building and on the other half a travelling overhead crane.

The control room/administration building is a five chassis transportable building constructed in Perth and transported to site.

The diesel tanks are a prefinished bolt together panel system imported from the USA.

Yarnima Power Station Non-Process Infrastructure Yarnima Power Station Non-Process InfrastructureYarnima Power Station NPI