Sino Iron Lines 3 to 6 SMP and Electrical Works

Location: Cape Preston, WA    Client: Sino Iron Pty Ltd    Project Value: $153M

Sino Iron Lines 3-6 SMP & Electrical Works

Structural, mechanical, piping, electrical and commissioning works at the AG mill, pebble crusher and stockpile tunnel areas for processing lines 3 to 6.
In total Kerman installed 30,000 tonnes of structural and mechanical items, 38km of pipe (including slurry pipe, process water pipe, raw water pipe, cooling water pipe, gland water pipe, potable water pipe and compressed air pipe) and 84km of cable.
At the beginning of the project Kerman developed a 3D model to allow accurate scheduling and detailed planning of works.