Tianqi Lithium Hydroxide Processing Plant Buildings

Location: Kwinana, WA    Client: Tianqi and MSPE   

The project includes the design development and construction of the Spodumene, Limestone and TAS buildings superstructure as well as the Product Storage Building superstructure and Clean Room to achieve a minimum design life of 25 years, including authorities’ approvals, roller doors, doors, bollards, barriers, electrical, communications, lighting, hydraulics (water and waste), security, mechanical ventilation and fire system plus modelling.

Additional works include tank installation, LHPP1 cladding (TAS Filter building, Drying building, Hydro 3-De and Soda Ash Storage), Compressor shelter fabrication and installation along with various minor works.

Completion of the works is anticipated for December 2018.

2579