West Angelas Expansion – Stacking & Reclaiming

Location: Via Newman, WA    Client: Rio Tinto Iron Ore/Calibre    Project Value: $11M

West Angelas 25mt/a Expansion – Stacking & Reclaiming

Lump Sum Contract to extend the West Angelas Mine Stockyard stacking and
reclaiming capacity by 250m, bring the total length up to 750m.

The mine produces high grade iron ore and this upgrade was part of an overall upgrade
designed to bring capacity up to 25MT /annum.

Works included the extension of the two stacker and one reclaimer conveyors which comprised the fabrication and installation of new drive frames and drives, conveyor modules, belt splicing, fire and dust suppression systems.